Dalian Ganjingzi leather town of Fort Yangjuan Village, a
six-story buildings is very conspicuous, hanging on the roof and the sunrise at
the floor about 300 solar collectors. Do not look down upon these solar
collectors, it makes the building room temperature maintained at 18 ° C in the winter and summer 24 ℃ ,
75 tons of coal annually to reduce consumption. In April this year, the
building was completed and put into use, is the city's use of renewable energy
demonstration project.
It is understood that during the "12th
Five-Year period, the city building energy efficiency will be based on the city
to expand to towns and villages to the 2015 building energy efficiency will be
saving a grand total of 550 million tons of standard coal.
It is learned that the "12th
Five-Year" period, the city plans to add six million square meters of
solar water heaters, building integrated applications area. Municipal
Construction Committee at the building energy efficiency, the official said,
this demonstration project has four national patents and international patents,
and took three years before the successful implementation of city building
energy efficiency sector. Light through the solar inverter to heat transfer
to the water supply, the water will be stored in a hierarchical storage tank,
which provides a reliable heat source for the building heating, refrigeration
systems.
Dalian City building energy consumption
monitoring platform has been built, are the Dalian Municipal Construction
Research and Design Institute Co., Ltd. office the pilot building energy
consumption monitoring test run; 7 online monitoring of large public building
energy consumption has been basically completed table with installation, energy
consumption data for online monitoring.
Made it clear that the Ordinance to
strengthen the monitoring of climate resources, and encourage climate resources
development, utilization and protection, strengthen the climatic resources
monitoring infrastructure construction and climate resources the census, the
establishment of a climate resource monitoring data collected and submitted and
shared system, further defined a range of climatic feasibility studies.
Ordinance to encourage units and
individuals to the installation and use of solar hot water systems, charge controller heating and cooling systems, solar photovoltaic power generation systems, such
as the utilization of solar energy systems. Construction units should be in the
design and construction of buildings, to provide the necessary conditions for
the use of solar energy, while encouraging the priority development and
utilization of wind energy resources to support wind energy resource-rich
regions.
The Ordinance requires climatic feasibility
studies, urban planning, the state key construction projects, a major regional
economic development projects and large-scale solar, wind and other climatic
resources development and utilization projects should be carried out, and
verification bodies and workflows provisions. The regulations also competent
meteorological department, climatic feasibility studies institutions and their
staff related liability provisions.
没有评论:
发表评论