Solar energy companies to build a green building


1, choose products based on different regions

A wide range of solar water heater on the market, to differentiate according to the types of solar collectors can be divided into a vacuum tube and a plate; structural distinction can be divided into one and split; craftsmanship distinguish, can be divided into pressure and pressure. Therefore, in the choice of products, the developers should first be based on a relatively clear choice.

2, the strength, range of products enterprises should give priority to cooperation

Unlike other building materials from the standards of select products, solar products, its installation by area, floor height a very large impact. Types of products have advantages and disadvantages no absolute good, the bad points, but also do not have a product that is perfect an absolute advantage, so developers choose the type of solar cell collector should according to the installation location of climate characteristics as well as floors height, the required hot water temperature, use to select, do not be misled by some manufacturers to spend more money wasted.

But in selecting strategic partner, it must be noted, the other party should first full strength strong enough to be able to meet the various needs of developers, otherwise they might be interested in a project or even the company's strategic development impact.

Four synchronous

Must do synchronized solar energy and building design, simultaneous construction and installation, simultaneous acceptance sync late management, and integration of solar energy into building standards to promote components.

1, the supplier must have a separate design team, and at the same time pre-synchronous design

First, the location of the project surroundings of fieldwork On this basis, the designer should be able to arranged according to the plane of the entire residential buildings, the effect of the facade and structure factors, according to the norms related industry standards and national regulations selection system type, type, color, and installation location, do the whole building and the surrounding environment is coordinated.

If development projects in various enterprises in the development of the coastal cities, as a strategic partner in the select solar water heater manufacturers need to pay special attention to the reasonableness of the stent design of the solar water heater, should have sufficient strength and rigidity to ensure that there is sufficient load-bearing capacity. Avoid strong typhoons and other severe natural disasters, the quality, but off bracket overblow collapsed rack, vacuum tube broken more serious losses. Needs to be emphasized is that the design of the solar water heater must be synchronized with the overall architectural design.

2, the construction management team should be a professional construction team and scientific suppliers

Participation of all parties to establish and improve the quality and technology management system. To clear construction quality control measures, to ensure that it meets the requirements of design quality; building solar panel organize the construction of special construction program developed by a team of construction and solar installation professional construction qualification.

Correspondent, through technical training and design to improve the technical quality of the on-site quality management personnel and a sense of responsibility. Design content is not informative or not by the policy, technical construction drawings review can not organize the construction. In winter in colder areas, water heaters and pipes must be insulated antifreeze processing prevent pipe Donglie. Select strategic partners, developers must focus on and examine whether a company has strong technical installation and construction team and management team. In addition, Xu special attention to the construction of the solar water heater must be synchronized and building construction.

The late property management problem

The solar water heater is difficult to spread to the city every household, Property Management of trouble from the late great reasons. Therefore, in the choice of partners, shall require the supplier on the current level of solar energy and building supporting system late management system combined with the construction of the incremental cost of the system with the construction of conventional energy effective complementary problem, you must submit a detailed, comprehensive The reasonable solution.

In short, the strategic cooperation is an effective channel to Win, suppliers should strive to meet the development needs of project developers; developer is also in line with the principle of equality and mutual benefit, and suppliers to the show platform. The same time, the two work together on a number of challenges to overcome, so as to promote the rapid development of building energy efficiency.