June 20 to 21, the National Network of
Qinghai Electric Power Company, China Electric Power Research Institute,
Qinghai Electric Power Company and other units jointly conducted a real low
voltage ride through validation tests. The test is for Qinghai Haixi area
network performance photovoltaic power plants and field verification.
Xinjiang and the Northwest 750 kV main grid
interconnection switching station to the Qaidam Iqe substation side of the line
becomes single phase of Qaidam test to become this test project. China EPRI
monitoring at nearly 30, and along the line from Golmud to Ulan select four
photovoltaic power plants, photovoltaic inverter 12 different types of species,
as well as a variety of SVG and SVC reactive power compensation device,
covering the country now mainstream models installed photovoltaic inverters and
reactive power compensation device.
During the test, China EPRI field view of
the three power stations - Golmud
River photovoltaic power
plants, photovoltaic power plants Golmud GD, Ulan Yellow photovoltaic power
plants, other power plant according to claim the initiative to report off-grid
situations. From reporter to grasp the situation, the inverter side, the sun is
the best performing power modified sine wave inverter inverter all its normal, there was no
off-grid situations. In addition a number of brands have different levels of
inverter off-grid situations arise, ranging from a few to as many as several
dozen.
The test better grasp of the large-scale
centralized PV power plant connected to the grid characteristics, inspection
Northwest power grid PV power plant low voltage ride through technology
applications and reactive power compensation device control strategy the actual
results, but also for future photovoltaic and other scientific data accumulated
.